Key responsibilities
Pre - fabrication and material control
- Review drawings, specifications and the QCP before fabrication starts; flag inspection and hold points to production.
- Verify incoming steel (plate, channel, angle, RHS, pipe) against mill certificates, grade and dimensions; maintain material traceability through heat numbers.
- Confirm that approved Welding Procedure Specifications (WPS/PQR) are in place and that welders hold valid, in-scope qualifications (SANS/ISO 9606-1 or AWS D1.1).
- Check consumables storage, electrode baking and handling.
In-process inspection
- Inspect fit-up, joint preparation, root gaps, alignment and tack welds before welding.
- Monitor welding parameters (amperage, voltage, travel speed, preheat and interpass temperature) against the WPS.
- Carry out dimensional checks on frames, stringers, legs and idler frames: length, squareness, diagonals, flatness, hole positions and idler centres.
Final inspection and NDT
- Perform 10% visual inspection (VT) of completed welds to ISO 5817 / AWS D1.1 acceptance levels as specified.
- Perform Level 2 Magnetic Particle Testing on fillet and butt welds, lifting lugs and critical joints; interpret and report results.
- Perform Level 2 Ultrasonic Testing on full-penetration butt welds, thick sections and critical structural joints; set up and calibrate equipment, size and evaluate indications.
- Complete NDT procedures, inspections and technique sheets for approval by the Level 3 where required.
- Raise non-conformance reports (NCRs), specify repairs and re-inspect repaired welds.
Surface preparation and coating
- Verify blast profile, cleanliness, DFT and coating system against the painting specification where in scope.
Documentation and client interface
- Complete inspection and test records, NDT reports, dimensional reports and release notes.
- Compile the final data book (QCP sign - offs, material certificates, welder qualifications, NDT reports, NCRs).
- Ensure NDT equipment, gauges and calibration blocks are in date and calibrated.
- Support root - cause analysis and continuous improvement of welding quality and repair rates.
To apply immediately for this position click here.
|
|
|
Qualifications and experience
| Requirement
|
Minimum
|
Advantageous
|
| Schooling
|
Grade 12 (Matric) with Maths and Physical Science
|
N4–N6 or National Diploma in Mechanical/Metallurgical Engineering
|
| Magnetic Particle Testing (MT)
|
Level 2, SAQCC-NDT or PCN (ISO 9712), current
|
Multi-sector endorsement
|
| Ultrasonic Testing (UT)
|
Level 2 welds, SAQCC-NDT or PCN (ISO 9712), current
|
Phased Array (PAUT) Level 2
|
| Welding inspection
|
IIW/SAIW Welding Inspector Level 2 (or CSWIP 3.1)
|
IIW Welding Specialist / Senior Inspector
|
| Other NDT
|
—
|
Penetrant Testing (PT) Level 2; Visual Testing (VT) Level 2
|
| Coating inspection
|
—
|
NACE/AMPP CIP Level 1 or SAIW coating inspector
|
| Experience
|
3–5 years inspecting structural steel fabrication
|
Bulk materials handling, conveyor or mining equipment
|
| Standards knowledge
|
ISO 5817, ISO 17640, ISO 17638, AWS D1.1, SANS 10094 / SANS 2001-CS1
|
ISO 3834, ISO 9001 quality systems
|
| Licence
|
Valid driver's licence (Code B/EB)
|
Own transport
|
| Medical / safety
|
Fit for work, valid eye test (near vision Jaeger J1 and colour vision, as ISO 9712 requires)
|
Working at heights; site induction tickets
|
Skills and competencies
- Reads fabrication drawings, weld symbols and tolerances accurately.
- Sets up and calibrates UT flaw detectors and MT yokes independently.
- Writes clear, accurate reports in English; computer literate (Excel, Word, PDF reporting).
- Firm but constructive with production teams; holds the line on non-conforming work.
- Organised, detail-focused and able to manage several orders at once.
Working conditions
- Workshop environment with noise, dust, fumes and overhead lifting; full PPE required.
- Site visits to mines and plants, including underground or at height where required.
- Overtime and weekend work at month-end, shutdowns or tight delivery dates.
Performance measures
- Zero non-conforming product released to the client.
- Inspection and NDT reports issued within 24 hours of the test.
- Data books complete at dispatch.
- Weld repair rate tracked and trending down.
- Certifications and equipment calibrations kept current.
|